How we work

From request to report

What happens after you contact us, and the ways we can contract.

  1. 01

    Request

    You send the equipment, the location and the deadline.

  2. 02

    Scope

    An engineer confirms the codes, methods and site access with you.

  3. 03

    Quote

    You receive a written quote for the agreed scope.

  4. 04

    Mobilise

    Qualified inspectors travel to site with calibrated equipment.

  5. 05

    Inspect

    Work follows our documented procedures and your site safety rules.

  6. 06

    Report

    A signed report with findings, results and recommendations.

Contracting models

One-off inspection

A single job with a defined scope: an inspection campaign, a shutdown, a vendor visit.

Framework contract

Agreed rates for repeated work over a period, called off as you need it.

30/30 manpower rotation

Dedicated inspectors on your site, rotating 30 days on and 30 days off, so coverage never stops.

Asset lifecycle

From construction to risk-based intervals

How inspection follows an asset through its life, and where risk-based inspection changes the plan.

  1. 1

    Fabrication and construction

    NDT, welder and procedure qualification, third-party inspection before delivery.

  2. 2

    Commissioning

    Inspection before first start-up of regulated equipment.

  3. 3

    Periodic inspection

    Statutory inspections at fixed, time-based intervals.

  4. 4

    RBI study

    An API 580/581 assessment ranks each item by probability and consequence of failure.

  5. 5

    Submission to the ARH

    The RBI case goes to the ARH. Intervals can be adjusted once a non-objection is obtained.

  6. 6

    Risk-based plan

    Effort goes where the risk is. Any defect found is assessed for fitness-for-service (API 579).

Fixed intervals compared with risk-based intervals

Fixed intervals

Low-risk item
High-risk item

Risk-based

Low-risk item
High-risk item
Time →

Illustration only. Actual intervals come from the RBI study and the regulator’s decision.