From request to report
What happens after you contact us, and the ways we can contract.

- 01
Request
You send the equipment, the location and the deadline.
- 02
Scope
An engineer confirms the codes, methods and site access with you.
- 03
Quote
You receive a written quote for the agreed scope.
- 04
Mobilise
Qualified inspectors travel to site with calibrated equipment.
- 05
Inspect
Work follows our documented procedures and your site safety rules.
- 06
Report
A signed report with findings, results and recommendations.
Contracting models
One-off inspection
A single job with a defined scope: an inspection campaign, a shutdown, a vendor visit.
Framework contract
Agreed rates for repeated work over a period, called off as you need it.
30/30 manpower rotation
Dedicated inspectors on your site, rotating 30 days on and 30 days off, so coverage never stops.
From construction to risk-based intervals
How inspection follows an asset through its life, and where risk-based inspection changes the plan.
- 1
Fabrication and construction
NDT, welder and procedure qualification, third-party inspection before delivery.
- 2
Commissioning
Inspection before first start-up of regulated equipment.
- 3
Periodic inspection
Statutory inspections at fixed, time-based intervals.
- 4
RBI study
An API 580/581 assessment ranks each item by probability and consequence of failure.
- 5
Submission to the ARH
The RBI case goes to the ARH. Intervals can be adjusted once a non-objection is obtained.
- 6
Risk-based plan
Effort goes where the risk is. Any defect found is assessed for fitness-for-service (API 579).
Fixed intervals
Risk-based
Illustration only. Actual intervals come from the RBI study and the regulator’s decision.